Phillips Electrical/Mechanical

  • ABOUT
    • SAFETY
    • MONTHLY NEWSLETTER
  • ELECTRICAL
    • Industrial Fans
    • Lighting
    • Plant Relocations
    • Control Systems
    • Generators
    • Dock Locks
    • Switchgear Maintenance
    • Infrared Scans
    • Electrical Installations
  • MECHANICAL
    • Piping
    • Welding
    • Generators
    • Exhaust Fans
    • Machine Relocations
    • Cooling towers
    • Dust Collection Systems
    • Compressed Air Systems
    • Chilled water systems
  • AGGREGATES
    • QUALITY CONTROL LABS
    • PREFABRICATED ELECTRICAL ROOMS
  • REQUEST A QUOTE
  • CONTACT
  • CAREERS
  • ABOUT
    • SAFETY
    • MONTHLY NEWSLETTER
  • ELECTRICAL
    • Industrial Fans
    • Lighting
    • Plant Relocations
    • Control Systems
    • Generators
    • Dock Locks
    • Switchgear Maintenance
    • Infrared Scans
    • Electrical Installations
  • MECHANICAL
    • Piping
    • Welding
    • Generators
    • Exhaust Fans
    • Machine Relocations
    • Cooling towers
    • Dust Collection Systems
    • Compressed Air Systems
    • Chilled water systems
  • AGGREGATES
    • QUALITY CONTROL LABS
    • PREFABRICATED ELECTRICAL ROOMS
  • REQUEST A QUOTE
  • CONTACT
  • CAREERS

AC / Equipment install

Picture

Phillips installed a 40 ton outdoor air conditioning / de-humidification system for a facility in Powder Springs, Georgia.

This project included pouring the concrete pad, installing the natural gas line for the unit, associated duct work, grills, registers, related controls  sensors, electric duct heaters, and 3 exhaust fans with duct work.

© 2025 Phillips Electrical/Mechanical